The Tveiten Substation project involved complete 132kV/420kV cable terminations and redundant grounding busbars as part of a regional transmission grid upgrade.
The project required high-voltage components and a carefully coordinated approach to strengthen the grid connection and ensure high reliability in demanding operating conditions.
The substation required reliable solutions for terminating, securing and earthing high-voltage cables at two voltage levels.
The requirements included:
In addition to supplying the products, Techpro provided technical support through product selection, dimensional verification and coordination with established manufacturers.
Techpro supports projects by supplying reliable power products aligned with specific application and project requirements. From product selection and sourcing to technical coordination and after-sales support, we work closely with customers to ensure the right solutions are delivered for each project.
This combination of product supply and technical support helped strengthen the substation for long-term, reliable grid operation.
Techpro’s Supply Scope :
Project photography showing the substation, high-voltage terminations, grounding arrangements and installed cable fixing systems.





Explore the products and solutions supplied by Techpro for this project, selected to meet specific application requirements and support reliable project performance.
Reach our Norwegian technical team directly or schedule a technical briefing at our headquarters.
Submit your bill of materials, project schematics, or equipment requirements.